The project design document, usually called a PDD, is the main public record of a carbon project. It sets out what the project will do, where it is, how it will measure its carbon and how it plans to protect that carbon over time. Buyers rarely read the whole thing, yet many of the claims they later repeat in their own reports are written there. This guide walks through the parts that matter most for a Ugandan forest, cookstove or agroforestry project, in the order a careful reader would take them.
Start with the published version
Verra and Gold Standard each use their own templates, but the idea is the same. A verified project publishes its PDD on the standard's registry, alongside its validation and verification reports. A copy in the developer's own folder is not the same thing. Drafts are often revised after review, so check the version number and the date against the registry before you read anything else.
Read the project description
The project description should name the location, the boundary, the project start date and the crediting period. Compare the place names with the boundary map. For a Ugandan project, the district and sub-county names in the text should match the boundary files. A vague description, such as a forest "in western Uganda", is a reason to ask for the exact boundary file or coordinates.
Check that the methodology fits the project
The PDD names the methodology the project follows. That choice decides what counts as a credit and how the baseline is set. Confirm that the methodology's conditions match what the project actually does. A project that describes tree planting but uses a forest protection method should explain the difference. Mismatches like this are a common reason a claim later has to be corrected.
Test the baseline and additionality
The baseline is the estimate of what would have happened without the project. For forest projects it usually means an expected rate of clearing in the project area, drawn from historical maps. Additionality is the argument that the carbon would not have been protected without carbon finance. Neither should be taken on trust. Look for the period of historical data, the data source, and whether the baseline reflects the drivers of clearing named elsewhere in the document. A baseline that assumes very high clearing inflates the number of credits, so treat it with care.
Review the monitoring plan
The monitoring plan says what will be measured, how often, by whom and with which tools. For forest carbon it typically includes permanent sample plots, allometric equations suited to local species, and satellite checks of forest cover. Check that the plan names the team responsible and sets a schedule for each measurement. A plan that promises monitoring "as required" gives a buyer nothing concrete to test.
Look for the risk and buffer discussion
Land-based projects carry the risk that stored carbon is released later through fire, clearing or a land dispute. The PDD should explain how that risk is assessed and how a buffer is set aside against it. Ask whether the discussion covers local pressures, such as demand for charcoal or encroachment on the boundary, and not only generic risks. Our guide to buffer pools and permanence explains how these reserves work.
Check safeguards and community consultation
A PDD should describe how the project consulted local people and how it handles environmental and social safeguards. Look for a summary of the consultation meetings, a record of the concerns raised, and a clear explanation of how the benefit-sharing plan works. Consultation only means something if the document shows what changed as a result. Our article on community benefit sharing sets out what to check in those plans.
Compare the PDD with the latest verification
Once you have read the PDD, open the most recent verification report and check that the figures line up. The credits issued should never exceed what the verifier confirmed. If the PDD projects a yearly number of credits that no verification has yet confirmed, ask why. A projection is an estimate, not a unit you can sell or retire.
A short buyer's checklist
- Confirm that the PDD version matches the one published on the registry.
- Match the project boundary to the official map or the shapefile supplied.
- Check that the methodology's conditions fit what the project does.
- Ask how the baseline was set, which data it used and when.
- Confirm the monitoring schedule and the team responsible for it.
- Read the reversal risk discussion and how the buffer is sized.
- Compare projected credits with the credits the verifier has confirmed.
Frequently asked questions
Is a PDD written in plain language?
Usually not. Expect technical terms and short references to standards. If a section is unclear, ask the developer to explain it in writing, or ask an independent adviser to review it before you buy.
Can I rely on a summary instead?
A summary is useful for a first look, but any claim you repeat publicly should rest on the full document and the registry record.
Where should I start?
Start with the registry copy and the most recent verification report, then work through the sections above. For the wider purchase steps, read our guide to buying carbon credits in Uganda.